Skip to content

Early-stage · research prototype

Predict environmental compliance failures before they happen.

SiteClear is an early-stage predictive compliance platform for multi-site logistics, fueling and chemical storage operations. It is being built and validated on public EPA and state underground storage tank data ahead of pilot deployments.

U.S. underground storage tank releases, confirmed per fiscal year

As of September 2025, more than 581,000 releases from federally regulated underground storage tanks had been confirmed nationwide, and about 54,000 still awaited cleanup.

Source: U.S. EPA, Semiannual Report of UST Performance Measures (states, DC and territories). Real public data, not a SiteClear result.

Platform capabilities

A transparent way to find environmental risk earlier

SiteClear combines public regulatory records, operator data and openly validated models to help multi-site operators decide where to inspect, test and maintain first. Each capability is labeled with its current status.

Prototype

Predictive risk scoring

First-generation model trained on public Texas tank records and validated on a held-out period. Pilot goal: at least a 15% reduction in environmental incidents versus each site’s baseline (to be validated).

In development

Monitoring integration

Designed to bring in tank-gauge, leak-detection and inspection records from operators. Not yet connected to live equipment; the demo uses simulated readings.

Prototype

Compliance workflows

Tracking for EPA and state UST, hazardous waste, stormwater and air requirements across many sites. Shown in the demo with sample records.

Prototype

Benchmarking

National Risk & Efficiency Index (v0 prototype on public EPA data) and Scope 1 and 2 GHG tracking (planned).

See every module and its status

Latest research result

Our first-generation release-risk model was trained on public Texas records up to 2021 and tested on 2022–2024, a period it never saw. Ranking facilities by its score, the top 10% contained 28.5% of the facilities that went on to report a release, compared with 10% for a random selection and 16.4% for “oldest tanks first”.

One state, public data, prototype (0.1.0, trained 2026-11-22). Limitations are on the model card.

Methods, metrics and limitations

0.71

ROC AUC on held-out 2022–2024 (0.5 = random)

19,550

Texas facilities scored in the test

29%

of releases found in the top-scored 10%

49

states (incl. DC) ranked in the Index v0 prototype

Operate tanks at multiple sites?

Request a free public-data risk report for your facilities and tell us whether a pilot would be useful.

Pilot program